EspañolEnglish
Technology transfer Tech & Industry transfer

Projects

The aim is to show different means of regulating pumping stations. It was conceived as a teaching tool for various regulatory systems. It has three pumps in parallel with a joint capacity of 4.5 litres/second for 40 mWC (metres of…
The system consists of the following elements: 1 SIEMENS PLC S7-314-2DP programable controller. 1 input node with 2 output modules with 4 analog 4-20 mA inputs each. 4 humidity-temperature sensors with 4-20 mA outputs. 1 PC with Windows 2000 equipped…
The main objective is the integration of all the subsystems involved in the ultrasound testing bench. Tasks are undertaken related to the wiring and configurations of the mechanical systems in the 3D-positioning sensor hardware, as well as the installation and…
In this project, a dynamic simulation software installations professional oriented architecture is developed. The software can be dimensioned from the pumping of a building to the heating and cooling system, through the number of allowances depending on sinks, etc ..
2
Page 2 of 3